Pecos Logistics Park
Project Highlights
This project featured an extensive stormwater sewer system and integrated trickle channel, rip rap, forebay pond outlet structure, and headwall. Due to soil rating, the entire water system was ductile iron pipe and cathodically protected.
Specific Project Area:
Lot 3