JAG Logistics Center
Project Highlights
Construction included an extensive stormwater sewer system and integrated trickle channel, rip rap, weir wall, and forebay pond.
![Loader moving earth on job site](https://nelsonpipeline.com/wp-content/uploads/2022/09/bh6-pecos-or-JAG_DSC0343.2880x1620-1024x576.jpg)
![Excavator dumping a bucket load on job site](https://nelsonpipeline.com/wp-content/uploads/2022/09/Jag4_DSC0393.2880x1620-1024x576.jpg)
Construction included an extensive stormwater sewer system and integrated trickle channel, rip rap, weir wall, and forebay pond.