Village East
Project Highlights
The storm system for this development incorporated a trickle channel, rip rap, and significant pond structure.
Specific Project Area:
Phases 1 and 2
![Cement pipes assembled in a ditch](https://nelsonpipeline.com/wp-content/uploads/2022/10/BH-Vilage-EastRev_0008.2880x1620-1024x576.jpg)
![Laid concrete sewage resevior](https://nelsonpipeline.com/wp-content/uploads/2022/09/concrete2.2880x1620-1024x576.jpg)
The storm system for this development incorporated a trickle channel, rip rap, and significant pond structure.
Specific Project Area:
Phases 1 and 2