Green Valley Ranch

Project Highlights

Projects within this major master-planned development included various mainline installations and services. Scopes also included an engineered trench and dewatering for a fifty-four-inch (54”) micro-tunnel for a steel encased epoxy lined forty-two-inch (42”) sewer waste main, trickle channels, weir structures, rip rap, and outlet structures.

Specific Project Area:

Filings 1 Onsite and Offsite, 2, First Creek Interceptor, FCI Outfall, 3, 5, 7, 39, 45, 57, 62, and Regional Pond A

Bulldozer on job site
Excavator on job site